Architect's test fit · landlords, letting agents, property managers
Office test fit: a floor's capacity in 3 working days.
Two layout options drawn on your plan, capacity tested against French regulations, brochure-ready boards. Signed by a registered architect, delivered in 3 working days, in English and French.
From €790 excl. VAT per floor · 3 working days
- Published price€790 to €1,690 excl. VAT per floor depending on area, shown here, no quote needed.
- 3 working daysFrom acceptance of the proposal and receipt of a usable plan.
- Signed by an architectRegistered and insured, drawing every floor personally.
- IndependentWe sell neither fit-out works nor furniture: the test fit is our only fee.
Who it is for
Ordered by those who let.
- 01
Letting agents
A plan that shows the use, not an empty floor: the viewing starts before the viewing.
- 02
Property managers
All your vacant floors tested in one format, at a known price, typical floors included.
- 03
Owners and asset managers
The real capacity of the asset, to set the rent and decide on landlord works.
Are you a tenant?
A test fit is ordered by the landlord, its letting agent or property manager: ask them for the floor's test fit. Once the lease is signed, we design your fit-out and manage the works.
Fit-out after signing
What you receive
Everything needed to market the floor, on one set of boards.
-
01
Two layout options to scale
An open option and a mixed option (private offices and open plan), drawn on your plan with desks, meeting rooms, booths, reception and shared areas.
-
02
The capacity schedule
For each option: desks, private offices, meeting rooms and seats, booths, sq m per desk.
-
03
The regulatory capacity note
One page: permissible headcount given escape routes, travel distances, sanitary facilities and fresh air, under the French rules in force on the date of the study. It does not replace a technical inspection body (bureau de contrôle), which we recommend appointing.
-
04
Brochure-ready boards
High-resolution PDF with title block, clean and legible, ready to drop into a brochure or a listing.
-
05
DWG files
For your architects, the fit-out firms you consult and tenants who want to go further.
-
06
In English and French
Included at no extra cost: international tenants read the plan in their own language.
One round of adjustments included, delivered within 2 working days of your comments.
Example
The capacity note, exactly as you receive it.
For each option (here option A), the headcount is tested against the rules that limit it: escape routes, travel distances, sanitary facilities, fresh air. What the plan satisfies is ticked; what depends on an assumption or on data still to obtain is flagged.
WorkRepublik · Regulatory capacity noteFictitious floor · 598 m² · Option A
| Item | Requirement | Floor (from the plan provided) | Status |
|---|---|---|---|
| Headcount used | 60 people | Assumption: one occupant per desk, visitors not counted | |
| Escape routes | 2, or 1 + 1 secondary | 2 staircases | ✓ |
| Exit units of width | 2 in total | 2 (one per staircase) | ✓ |
| Travel distances | 40 m maximum to reach a staircase; no dead end over 10 m | About 26 m maximum (measured on the plan); only dead ends: the aisles between benches, under 5 m | ✓ |
| Sanitary facilities | 6 WCs and 2 urinals for 30 women and 30 men; 3 urinals above 40 men | 7 WCs including 1 accessible, and 2 urinals (drawn on the plan of the fictitious floor) | Assumption |
| Fresh air | 1,500 m³/h for desks (25 m³/h per occupant) and 720 m³/h for the 24 meeting seats (30 m³/h): 2,220 m³/h if fully occupied | System airflow to be confirmed by the landlord | To obtain |
Rules applied: French Labour Code, art. R4216-8, R4216-11, R4228-10 and R4222-6, in force on 17 November 2026. From 1 January 2027, fire safety design rules move to the Construction and Housing Code (decree no. 2025-1100). This note does not replace a technical inspection body.
Pricing
The price is on the page. Not in a quote.
One grid by floor area, identical typical floors at −30%, invoiced on delivery. What the price includes, and what it doesn't, is written below.
| Floor | Per floor | Working days |
|---|---|---|
| ≤ 500 sq m | €790 excl. VAT | 3 |
| 501 – 1,000 sq m | €1,190 excl. VAT | 3 |
| 1,001 – 2,000 sq m | €1,690 excl. VAT | 3 |
| > 2,000 sq m | Above 2,000 sq m per floor: a written, tailored proposal. | |
−30 %Identical typical floor (same plan, same building)
Included
- Two layout options to scale
- The capacity schedule
- The regulatory capacity note
- Brochure-ready boards
- DWG files
- In English and French
- One round of adjustments included, delivered within 2 working days of your comments.
Not included
- On-site survey if the plan is not usable (quoted separately).
- A technical inspection body's assignment, which we recommend.
- 3D views and renderings.
- Engineering studies (HVAC, electrical, structure), cost estimates and planning or building applications.
- More than two layout options.
Process
From your go-ahead to delivery: three working days.
- Day 0
You send the plan
Through the order form: two minutes, with a link to the plan or by email.
- Day 0
You receive the proposal
The same working day: price from the grid, timing, terms. You accept it by return email.
- Days 1–3
We draw
The two options, the capacity schedule, the regulatory note, the boards.
- Day 3
Delivery
PDF, DWG, schedule and note, in English and French.
- +2 days
Adjustments
One round of comments taken on board, delivered within 2 working days.
Invoiced on delivery, payable within 30 days.
What we need
- The floor plan: DWG preferably, or a scaled PDF with legible dimensions.
- The address, the floor and the advertised area.
- Optional: the type of tenant targeted (sector, size) and your logo for the boards.
Test fit terms
- Price bracket
- Based on the floor area shown on the plan provided (or, failing that, in the brochure).
- Several floors
- Each floor at the grid price; an identical typical floor (same plan, same building) at −30%. Beyond three floors, the timing is written in the proposal.
- Who orders
- The landlord, its letting agent or property manager, on behalf of the owner or with its consent to use the plan. The invoice is issued to whoever accepts the proposal.
- What starts the clock
- Written acceptance of the proposal and receipt of a usable plan. Nothing is committed before that.
- Sharing
- Boards and files may be used to market the floor; we use your plans only for the study ordered.
- Payment
- Invoiced on delivery, payable within 30 days.
Compare
Not all test fits are equal.
| Criterion | WorkRepublik test fit | “Free” test fit from a fit-out firm | Automated test fit software |
|---|---|---|---|
| Price | €790 to €1,690 excl. VAT, published | Free, borne by the fit-out firm with a view to the works | No public price on the vendor's website checked: demo on request |
| Timing | 3 working days, written in the proposal | Varies | 24 hours or less, as advertised by the vendor |
| Who draws | A registered architect | The fit-out firm's team | AI, validated by the vendor's architects (per the vendor) |
| French rules tested | Escape routes, distances, sanitary facilities, fresh air: one-page note | Depends on the firm | To be checked with the vendor |
| Interest in the works | None: no works or furniture sold | Yes: it is paid through the works | None |
| DWG and English | Included | Depends on the firm | Depends on the plan |
Next
And once the lease is signed
The test fit helps get the floor let. The tenant who signs can then appoint us for the fit-out; if we drew the test fit for the landlord, we tell the tenant before any appointment.
Let
Landlords, letting agents, property managers
Make a floor legible, compliant and desirable before the first viewing.
Fit out
Tenants, once the lease is signed
From a leased floor to delivered offices, with a budget and programme written from the start.
Transform
Occupiers staying in their premises
Evolve offices in place, while organising business continuity.
Questions
Frequently asked questions
What is a test fit?
A test fit, or capacity study, checks that a brief fits a given floor: how many desks, meeting rooms and shared areas, with which circulation. It is a sketch layout, not a construction design: it helps market the floor and frames discussions with prospective tenants.
How quickly is it delivered?
In 3 working days from written acceptance of the proposal and receipt of a usable plan. The included round of adjustments is delivered within 2 working days of your comments.
How much does it cost?
€790 excl. VAT for a floor up to 500 sq m, €1,190 from 501 to 1,000 sq m, €1,690 from 1,001 to 2,000 sq m. Above that, a tailored written proposal. An identical typical floor (same plan, same building) is 30% off. Invoiced on delivery, payable within 30 days.
Is the stated capacity guaranteed?
No. The architect has an obligation of means, not of result. A test fit is a sketch-stage study. The capacity note checks the permissible headcount given escape routes, travel distances, sanitary facilities and fresh air under the rules in force, based on the plan provided. It replaces neither the tenant's fit-out design nor a technical inspection body, which we recommend appointing.
What if my plan is not usable?
We tell you before you accept the proposal: nothing is invoiced. An on-site survey can be quoted in Paris and the Paris region.
Can a tenant order a test fit?
No. The WorkRepublik test fit is ordered by the landlord, its letting agent or property manager. If you are a tenant considering a floor, ask them for the test fit. Once the lease is signed, we can design your fit-out and manage the works.
Can the plans be shared?
Yes: the boards and files are for marketing the floor (brochures, listings, sending to tenants and their advisers). We use your plans only for the study you ordered.
Several floors, different floors: how is the price worked out?
Each floor is invoiced from the grid, based on the area shown on the plan provided. An identical typical floor (same plan, same building) is 30% off. Beyond three floors, the delivery time is written in the proposal.
Do you work outside Paris?
Yes. A test fit is done from the plan, anywhere in mainland France. When an on-site survey is needed, it is offered in Paris and the Paris region.
Send the plan. Get the proposal today.
Written proposal the same working day, delivery 3 working days after you agree.